mandag 7. april 2014

onsdag 26. mars 2014

tirsdag 25. mars 2014

søndag 23. mars 2014

[P4] - Case studies: Using the context as a screen







Pablo Valbuena - Using the existing context as a part of his work




Krysztof Wodiczko - Using a facade as a screen






Janet Echelman - Screening on fabric


http://www.flickr.com/photos/mempix/5646337974/sizes/o/in/photostream/




Electric Fores Festival - trees as screens




http://www.flickr.com/photos/haleytab/7797020226/sizes/s/in/photostream/

lørdag 22. mars 2014

[P4] Location of workspaces



Placement of Work spaces/exhibition spaces
 
As an architect I am not designing the art, but rather the frames for the art to evolve within.
The spots out in the woods is spaces which are to be used as a workspace for the Time bases artists. Here they can develop their work and exhibition along the process of the work. The architecture encourage to use the exhibitionspace while developing their projects. 


Our site at prora has some special qualities that the school in Berlin does not have.
    - Nature:     - woods
                        - ocean
    - The combination of music and media

This three properties of Prora is something you can't find in Berlin, which makes this place unique. And it is this three qualities the exhibitionspaces/Workspaces is defined from.

The form of the workspaces is defined of the surrounding context, and the possible views the the artist can benefit from. The spaces is not to be defined with walls and roofs, but a constructed frame that have the possibility to be covered where it is needed. In that way the artist can shape the space out of their wishes. 




[P4] Working model // Step 2

Process model 1:50, front

Process model 1:50, Music boxes

Process model 1:50, Side,  Music boxes

Process model 1:50 fixed facilities

The next step at the working model was to place all the music spaces, and se how it interacts with the existing structure. By placing the planned spaces, we could see some conflicts and got some new ideas, which is to be included in the model in the further process.

[P4] Working model of the Prora structure


Working model 1:50, above


Working model 1:50, Front


Working model 1:50, side

This model is a working model to visualize our consept. At this point the structure of the exixting building is buildt up, and the openings in the structure is where music rehearsal boxes wil be placed.

tirsdag 11. mars 2014